dept of
transportation
bridge & highway infrastruture rehabilitation
Project Overview
Performed fender system replacement, concrete repairs & underwater pile rehabilitation for critical transportation infrastructure
Scope of Work
Deteriorated pile restoration project
Removal of pile obstructions
Fiberglass pile jacket installation (QTY. 44)
HDPE pile protection jackets (28)
Underwater footer grout placement
Structural rehabilitation
Fender system replacement
Concrete seawall repairs
Services Performed
Surface preparation (power washing)
Site excavation: Jetting & breaking of rip rap, boulders
Pile cleaning with pressure washers
Jacket wrapping & installation
Topside & underwater burning
Grouting operations
Seawall concrete repairs/spall repairs
Inspection and documentation
Removal & replacement of old fender system
Equipment & Tools Utilized
Surface-supplied diving systems
Fiberglass pile jacket systems
Grout pumps
Hydraulic rock drill, rock breaker, chainsaw
Pneumatic CP9
Underwater burning equipment
Rigging and lifting equipment
see job photos below