department of
environmental protection
removal of 100+ sewer system obstructions
Project Overview
Provided commercial diving services for a state environmental agency wastewater infrastructure rehabilitation project involving the removal of unauthorized steel obstructions from an active sewer system. Operations required precision cutting, obstruction removal, structural repair, inspection, and environmental compliance procedures within a hazardous wastewater environment.
Scope of Work
Wastewater infrastructure rehabilitation
Obstruction removal and mitigation
Hazardous environment diving operations
Structural sewer repairs
Pre- and post-repair inspections
Diver-assisted cutting operations
Environmental compliance support
Contaminated water work operations
Decontamination and site control procedures
Services Performed
Comprehensive pre-construction inspection and documentation of sewer infrastructure
Identification and mapping of steel tie-back obstructions penetrating the sewer structure
Removal of over 100 steel tie-backs that had completely penetrated the sewer system
Diver-operated hydraulic reciprocating saw cutting operations
Track saw and cut-off wheel operations for obstruction removal
Extraction and recovery of severed steel tie-backs
Cleaning and preparation of penetration locations
Packing of penetrations with approved repair fiber materials
Application of splash-zone epoxy repair systems to seal and restore structural integrity
Post-repair inspection and documentation of completed repairs
Verification of completed obstruction removal and repair work
Implementation of contaminated water diving protocols
Execution of decontamination procedures for personnel and equipment
Equipment & Tools Utilized
Surface-supplied diving systems
Diver communications systems
Hydraulic reciprocating saws
Hydraulic track saws
Cut-off saws and abrasive cutting discs
Rigging and recovery equipment
Underwater hand tools
Inspection cameras and video documentation systems
Splash-zone epoxy repair materials
Repair fiber packing materials
Decontamination equipment
Hazardous environment PPE
Key Project Elements
State Environmental Protection Agency Project
Wastewater Infrastructure Rehabilitation
Hazardous Environment Diving
Obstruction Removal
Steel Tie-Back Removal
Structural Sewer Repair
Splash-Zone Epoxy Repairs
Pre- and Post-Construction Inspections
Contaminated Water Operations
Environmental Compliance
Decontamination Procedures
Critical Underground Infrastructure
Safety & Environmental Compliance
Work was performed within an active wastewater environment under strict hazardous-material and contaminated-water procedures. Operations included controlled dry-site support areas, personnel and equipment decontamination protocols, environmental protection measures, daily safety briefings, and compliance with project-specific health and safety requirements.
See project photos below.