Project Overview

Provided commercial diving and marine construction support services for a large-scale canal remediation and environmental restoration project at an EPA-designated Superfund site. Operations supported contaminated sediment removal, engineered backfill placement, environmental containment, and restoration of impacted waterways through diver-assisted excavation, shoring, and Controlled Low Strength Material (CLSM) placement activities.

Scope of Work

  • EPA Superfund site remediation

  • Canal restoration and environmental cleanup

  • Diver-assisted excavation support

  • Contaminated sediment remediation

  • Shoring and excavation support

  • CLSM placement operations

  • Tremie placement support

  • Environmental containment operations

  • Underwater inspection and verification

  • Marine construction support

Services Performed

  • Diver reconnaissance and pre-construction assessments

  • Support of contaminated sediment excavation and removal operations

  • Identification and removal of submerged debris and obstructions

  • Underwater excavation and bottom preparation activities

  • Verification of excavation limits and design elevations

  • Installation and monitoring of excavation support and shoring systems

  • Diver-assisted positioning and inspection of sheet pile and shoring components

  • Preparation of canal bottom for engineered backfill placement

  • Support of Controlled Low Strength Material (CLSM) placement operations

  • Monitoring and verification of tremie pipe placement during underwater CLSM pours

  • Diver observation of material placement to ensure proper coverage and prevent segregation

  • Verification of fill elevations and placement tolerances

  • Inspection of completed remediation and restoration areas

  • Photo and video documentation of completed work

  • Environmental compliance support throughout construction operations

Equipment & Tools Utilized

  • Surface-supplied diving systems

  • Diver communications systems

  • Tremie placement systems

  • CLSM placement equipment

  • Excavation support equipment

  • Sheet pile and shoring systems

  • Crane and excavator support equipment

  • Rigging gear and lifting slings

  • Survey and positioning equipment

  • Underwater hand tools

  • Inspection cameras and documentation equipment

  • Hydraulic and pneumatic tools

Key Project Elements

  • EPA Superfund Site

  • Environmental Remediation

  • Canal Restoration

  • Contaminated Sediment Removal

  • Diver-Assisted Excavation

  • Shoring and Excavation Support

  • Controlled Low Strength Material (CLSM)

  • Tremie Placement Operations

  • Environmental Containment

  • Underwater Inspection

  • Marine Construction Support

  • Long-Term Site Restoration

Safety & Environmental Compliance

Work was performed within a regulated environmental remediation project under strict health, safety, and environmental requirements. Operations included daily safety briefings, environmental protection measures, controlled material placement procedures, contamination prevention protocols, and continuous coordination with remediation contractors, engineers, and environmental oversight personnel.

Technical Highlights

  • Diver-assisted support of contaminated canal remediation activities.

  • Monitoring and verification of underwater CLSM placement through tremie systems, allowing material to be placed below water without segregation or turbidity issues.

  • Support of excavation and shoring operations necessary to safely restore canal geometry and stabilize surrounding infrastructure.

  • Verification of final grades and material placement to support long-term environmental containment and site restoration objectives.

See project photos below.